3. The "You would have to be a fool not to take this low bid..."

or: "I can remodel your kitchen for $5000 because my overhead is so low."

HINT: If all three bids are based on the same drawings and specifications AND they are within 20% of one another, then the low bid might be o.k. MOST CONSTRUCTION DISPUTES BEGIN WITH AN UNREALISTICALLY LOW BID.